Print

New MV piling rig

For a new piling rig with 70m leader mast TMS has made the complete design and supplied the 70m leader mast and the cylinder systems for the leader mast erection and horizontal movement. The piling rig is able to drive piles with a lenght of 62m in a 1 to 1 racke (45º) position